8
2. Drive Train
2.1. Conveyor Drive Pulley & O-Ring
a)
Removal
•
Disconnect
the
power cord
from the machine.
1. Remove the
drive train side cover
.
2. Roll the
o-ring
off of the
conveyor pulley
.
3. Remove the
conveyor pulley
.
a) Loosen the set screw.
b) Pull the pulley off of the shaft.
b)
Installation
1. Place the
conveyor pulley
onto the
shaft
with the hub on the
inside.
2. Align the O-Ring grove in the
pulley
with the O-Ring grove on the roll
shaft.
Figure 4: Drive Train
Note: if motor belt is marked 5M450 15, then see addendum
Motor Pulley and Clutch
Feed Drive
Pulley
Motor Belt
28-0832-00
Door Switch
Double Sided Belt
Conveyor Pulley
Roll Gears
Feed Pinion
Pulley
Feed Drive
Belt
O-Ring
Figure 5: Conveyor Drive
Summary of Contents for 7K Plus
Page 2: ...ii...
Page 31: ...31 11 Appendix Side Frame Assembly Drawings...
Page 33: ...33 7KPlus Exploded Drive Train...
Page 34: ...34 10 Amp IEC Bracket Assy IEC Outlet...
Page 36: ...36 Retard Assembly...
Page 37: ...37 7KPlus Schematic...
Page 38: ...38...
Page 51: ...51...
Page 52: ...52 Phone 866 427 4546 Fax 603 332 8043 www brilininc com...