Chapter 3
3
Setup
Introduction
Unpack
Activation
Charge
Power On and Shutdown
Configuration
Installation Precheck
Introduction
Only qualified personnel should setup the RGX™ Gateway.
Choose a setup area that is in a
nonhazardous location
and has a clean, uncluttered surface on which to
work. Ensure the area includes a power source that is compatible with the unit's charging power supply
cord.
Additional setup needs will be supplied throughout this chapter. Needs will vary based on a unit’s intended
placement, operational power source, communication settings, and other factors.
Unpack
During the unpacking process, account for and examine each ordered item. If any item is missing or
appears to have been damaged, contact
Industrial Scientific
or an authorized distributor of Industrial
Scientific products. After unpacking, peel the protective plastic liner from the RGX case lid.
Table 3.1 Package contents
Quantity
Item
Description
As ordered
RGX Gateway
Moves data between compatible, enabled Industrial Scientific
gas-detection instruments and iNet.
As ordered
Charging power supply and power
cord
12 VDC power supply with customer-ordered cord that fits
one
power source type (AUS, EU, NA, or UK).
1
Document
Warnings and Cautionary Statements
Document Number: 0000037533
DO NOT CHANGE WITHOUT THE FOLLOWING AGENCY APPROVALS(S):N/A
Modified: 2018-05-25 13:18:14 EDT
State:In Work
INDUSTRIAL SCIENTIFIC CORPORATION
Title: PRODUCT MANUAL RGX GATEWAY-EN-1
Eng:
Drawing No: 17158071-1
Drawn By: Gaygan, Nancy
Created: 2018-05-16 10:24:51 EDT
Rev: 1
Printed By: Kuzmich, Bob
Int: 1.5
Date:May 29, 2018