page 11
Input Test:
For the duration of the test operation (e.g. programming) the
connection needs to be connected to U
B
(supply).
For ”RUN” operation the input needs to be disconnected from
U
B
(supply).
Output Error (pin 13):
semiconductor output; short-circuit and overload protection
switching voltage
10 ... 17 V (12 V DC); 11 ... 32 V (24 V DC)
switching current
10 mA ... 100 mA
overload current
0.5 A
Relay output:
internal relay output
used in series with (max. 12 outputs the power supply of which
is interrupted on detection of an error by hardware or user
program
On principle, the unit should be switched load-free.
switching current
100 mA ... 15 A
overload current
20 A
no. of switching
operations (load-free)
≥
10
6
response time
≤
3 ms
Housing drawing:
Summary of Contents for ecomat 100 R 360 Series
Page 1: ...System manual ecomat 100 type R 360 ...
Page 14: ...page 14 ...
Page 26: ...page 26 ...
Page 86: ...page 86 ...
Page 100: ...page 100 ...
Page 126: ...page 126 ...
Page 146: ...page 146 ...
Page 162: ...page 162 ...
Page 163: ...page 163 Annex 2 Wiring Annex 2 1 Type CR0015 ...
Page 164: ...page 164 Annex 2 2 Type CR0016 ...
Page 165: ...page 165 Annex 2 3 Type CR0017 ...
Page 166: ...page 166 Annex 2 4 Type CR0501 ...