20
INSTALLATION
isar -
Installation and Servicing
FLUE OUTLET
24 WATER CONNECTIONS - CH
Notes.
1. For heating loads in excess of 60,000 Btu/h use 28mm x 22mm
connectors to connect the boiler flow and return pipes to 28mm
system pipework.
2. Do not subject any of the isolating valves to heat as the seals may
be damaged.
C.H. FLOW
C.H. RETURN
Ecl
2396
22mm copper pipe
Isolating valve
(shown in the
open position)
Piping frame
Drain
point
22mm copper pipe
Isolating valve
(shown in the
open position)
Pressure gauge
Condensate drain pipe located here.