15
INSTALLATION
isar -
Installation and Servicing
FLUE OUTLET
2009
2
1
3
4
5
Note.
The template shows the positions of the fixing holes and
the flue hole centres for standard installation and for using
the stand-off kit. Care MUST be taken to ensue the correct
holes are drilled.
1. Separate the templates.
2. Tape template A into the selected position.
3. Ensure squareness by hanging a plumbline as shown. If
fitting a side flue extend the flue centre line onto the side
wall and tape template B into the selected position.
4. Mark onto the wall the following:
a The piping frame screw positions (choose one from
each group).
b. The position of the flue duct hole (see diagram below
and template).
Note.
Mark the centre of the hole as well as the
circumference
5. Remove the template from the wall.
14
WALL MOUNTING TEMPLATE
13 FLUE ASSEMBLY - Exploded View
An optional flue duct extension kit is required for
wall thicknesses greater than :
Side
455mm (18").
Rear 490mm (19
1/4
").
Rear flue arrangement shown
Ecl 2360
V
A
A
B
B
B
Extended centre line
305
See Note
Note.
If wall thickness is greater than 305mm then dimension H must be
reduced by the same amount and the offset may be adjusted accordingly.
18
31
44
57
70
83
96
109 122
135
148
See wall mounting template
Ecl 2359
0.5
1.0
1.5
2.0
2.5
3.0
3 .5
4.0
4.5
5.0
5.5
V
Distance in metres from side of the boiler to the side wall
LEGEND
1. Duct assembly.
2. Flue turret.
3. Turret gasket.
4. M5 x 10 pozi screw.
5. Turret clamp.
Summary of Contents for isar m30100
Page 1: ......