21
INSTALLATION
isar -
Installation and Servicing
ecl6068
Piping
frame
Rubber seal
Gas cock
(shown in the
open position)
GAS IN
D.H.W. Inlet
D.H.W. Outlet
2023
15mm copper pipe
15mm copper pipe
Regulator / Filter
'O' Ring
Piping frame
Isolating valve
(shown in the
open position)
Outlet
connector
Retaining
screw
Cross bar
The safety valve is located at the bottom RHS of the boiler.
The discharge pipe should be positioned so that the discharge of water or steam cannot create a hazard to the occupants of
the premises or damage the electrical components and wiring.
27 SAFETY VALVE DRAIN
IMPORTANT. The gas service cock contains a non-
metallic seal so must not be overheated when making
capillary connections.
Refer to Frame 2 for details of the position of the gas
connection.
The principle of the 1:1 gas valve ensures that the
isar m30100 is able to deliver its full output at inlet
pressures well below those required by BS. 6891.
A boiler gas supply pipe length of 20m and not less
than 15mm O.D. can be connected to the boiler via
the gas service cock union.
Ensure that the gas supply pipe does not foul the
boiler casing.
Refer to Frame 36 or 'Servicing' for details of the
pressure test point position.
26
GAS CONNECTION
25
WATER CONNECTIONS - DHW
Note.
The DHW inlet
isolating valve incorporates
a flow regulator / filter. It should
be inspected
to ensure no blockage
is evident.
1. To remove, turn off the valve, undo the
retaining screw and pull out the filter
by grasping the crossbar with pliers.
2. Reassemble in reverse order,
inserting in the direction of the arrow.