37
SERVICING
isar -
Installation and Servicing
5
E
cl 6076
Straight e
dge
25mm
+ 2
- 2
Ecl 6078
Ecl 2375
5
56 IGNITION ELECTRODE REPLACEMENT
57 FLAME DETECTION ELECTRODE REPLACEMENT
1. Refer to Frame 50.
2. Remove the boiler front and sealing panels. Refer to
Frames 42 & 43.
3. Unplug the ignition electrode lead from the control box.
4. Swing the control box down into the servicing position.
Refer to Frame 44.
1. Refer to Frame 50.
2. Remove the boiler front and sealing panels. Refer to
Frames 42 & 43.
3. Swing the control box down into the servicing position.
Refer to Frame 44.
4. Unplug the flame detection electrode lead from the
control box.
5. Remove the screw holding the ignition electrode to the
combustion chamber.
6. Remove the earth lead from the ignition electrode.
7. Remove the electrode, taking care not to dislodge the
grommet from the casing.
8. Fit the new ignition electrode, using the new gasket
supplied. Check dimensions as shown.
9. Reassemble in reverse order.
10. Check the operation of the boiler. Refer to Frame 50.
5. Remove the screw holding the flame detection electrode to
the combustion chamber.
6. Unbolt the sensing electrode earth lead from the earth point
beneath the boiler.
7. Remove the electrode, complete with grommet.
8. Fit the new flame electrode, using the new gasket supplied.
Check dimensions as shown.
9. Reassemble in reverse order.
10. Check the operation of the boiler. Refer to Frame 50.
Straight
edge
11mm
+ 0
- 4
Spark gap 3mm
+2
-0
Ecl
6077
SER
VICING
Summary of Contents for isar m30100
Page 1: ......