13
INSTALLATION
isar -
Installation and Servicing
1. Ensure the boiler is stood upright on a sound flat surface.
2. Carefully remove the strapping.
3. Fold back the top flaps to gain access to:
!
Wall mounting plate.
!
Instructions.
!
Hardware pack & fittings.
!
User control.
4. Remove the instructions and read thoroughly before
unpacking the product.
5. When ready for installation lift off the cardboard carton.
10 PACKAGING REMOVAL
Ecl 2356
11
BOTTOM PANEL AND FRONT PANEL REMOVAL
1. Remove the 2 screws from the underside of
the boiler.
2. Pull the panel forward at the bottom and lift
to disengage it from the top lugs.
3. Remove the screws from the underside of
the boiler.
4. Pull the RHS of the panel down, slide it to
the right and withdraw.
Ecl 2425
Bottom panel
Front panel
Retaining clip
1
3
INST
ALLA
TION
Summary of Contents for isar m30100
Page 1: ......