26
INSTALLATION
isar -
Installation and Servicing
34 FUNCTIONAL FLOW WIRING DIAGRAM
WARNING.
Whilst effecting the required gas soundness test and purging air from the gas installation,
open all windows and doors, extinguish naked lights and
DO NOT SMOKE.
A. Electrical Installation
1. Checks to ensure electrical safety should be carried out by
a competent person.
2. ALWAYS carry out the preliminary electrical system checks,
i.e. earth continuity, polarity, resistance to earth and short
circuit, using a suitable test meter.
B. Gas Installation
1. The whole of the gas installation, including the meter,
should be inspected and tested for soundness and purged
in accordance with the recommendations of BS. 6891.
In IE refer to I.S.813:2002.
2. Purge air from the gas installation by the approved
methods only.
35 COMMISSIONING AND TESTING
3
2
1
bk
or
or
Diverter
valve
gy
v
r
v v v v
Pump
pk
br
y/g
b
y/g
DC gas valve
b
r
br
Mains switch
DC
Fan
r
bk
y
pk
b
Flame detection electrode
y/g
r
r
Flue thermistor
y
y
pk
pk
b
b
r
r
DHW thermistor
CH control
thermistor flow
CH control
thermistor return
electrode
Ecl 6072
br
y/g
y/g
br
bk
N
L
E
b
b
Filter
External switch e.g.
room 'stat, programmer
PCB No.
P
HC
033
Overheat
thermostat
LEGEND
b
- blue
bk - black
br - brown
gy - grey
or - orange
pk - pink
r
- red
v
- violet
w - white
y
- yellow
y/g - yellow/green
INST
ALLA
TION
Summary of Contents for isar m30100
Page 1: ......