46
SERVICING
isar -
Installation and Servicing
Edge clip
12
13
14
23
10
Spring clip
Return pipe
securing bracket
17
25
11
Interpanel
15
Overheat
thermostat
Control
thermistor
Flow pipe
18
21
Flow pipe
securing bracket
19
26
27
Ecl
6082
Refer also to Frame 8 - 'Boiler Exploded View'.
IMPORTANT
Before starting the removal procedure, protect the gas and
electrical controls with a waterproof sheet or plastic bag.
1. Refer to Frame 50.
2. Remove the boiler front, bottom and sealing panels.
Refer to Frames 42 & 43.
3. Drain the boiler. Refer to Frame 69.
4. Remove the control box and place on one side. Refer to
Frame 63.
5. Remove the fan / venturi assembly and place on one
side. Refer to Frame 45.
6. Remove the burner and place on one side. Refer to Frame
46.
7. Remove the ignition and detection electrodes. Refer to
Frames 56 and 57.
8. Release the flue from the turret. Refer to Frame 23.
9. Remove the turret from the boiler. Refer to Frame 23.
10. Remove the automatic air vent, complete with the adapter.
11. Remove the M5 nut retaining the flue casting spring clip
and remove the spring clip.
12. Remove the M5 x 10 screw retaining the flue casting.
13. Release the silicone tubing from the sampling point.
14. Release the electrical connection to the flue thermistor.
15. Undo the 2 M5 x 10 flue spring clip retaining bracket
screws and remove the bracket.
16. Remove the flue casting.
73 HEAT ENGINE REPLACEMENT
17. Remove the edge clip securing the flue thermistor wiring.
18. Remove the blind grommet to gain access to the return
pipe securing bracket.
19. Unscrew the M5 screw and remove the return pipe securing
bracket by sliding forwards.
20. Remove the overheat thermostat and the control
thermistor. Refer to Frame 55.
21. Remove the securing pin to release the flow pipe.
22. Remove the condensate ‘S’ trap. Refer to Frame 61.
23. Remove the 2 M5 screws securing the interpanel to the
back panel.
24. Slide the heat exchanger and interpanel assembly upward
to disengage and remove from the casing, complete with
the flow pipe.
25. Remove the 2 M6 countersunk screws, remove the
interpanel and transfer to the new heat exchanger.
26. Remove the M5 screw and remove the flow pipe securing
bracket.
27. Remove the flow pipe and transfer to the new heat
exchanger.
28. Reassemble in reverse order, replacing gaskets or seals if
any sign of damage or deterioration is evident.
Note.
The heat exchanger is supplied with new combustion
chamber insulation boards. These should be fitted
(refer to Frame 58 before the burner and fan / venturi
assembly and before the ignition and detection
electrodes are replaced).
29. Refill the boiler. Refer to Frame 29.
30. Check operation of the boiler. Refer to Frame 50.
SER
VICING
Summary of Contents for isar m30100
Page 1: ......