Completion of the command
Normal completion of the wrap test (except the reply_mode) will be:
<slot.port> Test successful ==> no failure was found.
<slot.port> Test failed ==> a problem was found in the module.
For the ports which have not been disabled before the command was issued, the following message will
be returned:
<slot.port> Port not disabled. Execute the command to disable the port.
If the installed port does not support the wrap test (example: 8260 compatible modules), the following
message will be returned :
<slot.port> Not supported on this type of port.
Wraps Available
The following table gives the wraps available on WAN 2 I/O card.
Table
3-1. Wraps available on WAN Modules
Wraps
WAN I/O Card
E3
DS3
OC3
SMT1
E1
T1(DS1)
Internal
X
X
X
X
X
X
External
X
X
X
X
X
X
Reply_Mode
X
X
X
X
X
X
Payload
X
X
Far_End_Mode
X
X
Far_End_Payload
X
Note: X means that the wrap is available for the I/O card.
Chapter 3. Procedures
3-9
Summary of Contents for 8265 Nways ATM Switch
Page 1: ...8265 Nways ATM Switch IBM Problem Determination and Service Guide SY33 2128 00...
Page 2: ......
Page 3: ...8265 Nways ATM Switch IBM Problem Determination and Service Guide SY33 2128 00...
Page 8: ...vi 8265 PD and SG...
Page 10: ...viii 8265 PD and SG...
Page 11: ...Tables 3 1 Wraps available on WAN Modules 3 9 Copyright IBM Corp 1998 ix...
Page 12: ...x 8265 PD and SG...
Page 18: ...xvi 8265 PD and SG...
Page 26: ...xxiv 8265 PD and SG...
Page 32: ...1 6 8265 PD and SG...
Page 33: ...Chapter 2 MAPS Copyright IBM Corp 1998 2 1...
Page 134: ...3 32 8265 PD and SG...
Page 158: ...5 2 8265 PD and SG...
Page 159: ...Appendix A 8265 Part Numbers 8265 Parts Copyright IBM Corp 1998 A 1...
Page 160: ...1 Rear View A 2 8265 PD and SG...
Page 162: ...2 O O I I 3 4 5 A 4 8265 PD and SG...
Page 166: ...A 8 8265 PD and SG...
Page 168: ...X 2 8265 PD and SG...
Page 170: ......
Page 173: ......
Page 174: ...IBM SY33 2128...