![Hydronix Hydro-Control VI Operator'S Manual Download Page 28](http://html.mh-extra.com/html/hydronix/hydro-control-vi/hydro-control-vi_operators-manual_2192336028.webp)
28 Hydro-Control VI Operators Guide HD0456 Rev 1.7.1
Recipe parameter
Description
Pre-wet Water Limit
In the pre-wet phase this value limits the amount of water that will
be added before the system alarms.
Main Water
This is the amount of water to add during the main water phase of
the mix cycle if the system is in Preset Mode.
Main Water Limit
This is the maximum amount of water that the system will add or
calculate to add before it alarms. If the system is in CALC Mode a
check is made when the water calculation has been made. If the
system is in AUTO Mode then the system alarms when the system
reaches this value.
Main Water Trim
This is the amount of trim water to add to the recipe. Trim water is
included in the water calculation and changes the target when
calibrating the system to allow for a calibration to be made to a
batch which is not perfect.
1.3
Material addition/Mixing Times
Recipe parameter
Description
Dry Weight
This is the dry weight of all of the materials in the mixer, including
all aggregates and cement. If this can change due to weighing
errors or moisture correction, this value should be sent from the
batch control system to allow the calculation to be done to the best
accuracy.
Cement Weight
This is the weight of the cement added and, if entered, the Hydro-
Control log will contain the water/cement ratio for a particular batch.
Cement Timeout
This is the amount of time that the system will wait after issuing a
pre-wet done signal before alarming if it has not received the
cement in signal.
Initial Mix Time
This is the amount of time that the system will mix after aggregate
addition before adding water
Pre-wet Mix Time
This is the amount of time that the system will mix after adding the
Pre-wet water before it sets the pre-wet done signal. This can be
used if it is required to mix the water into the batch before adding
cement. The cement should be controlled using the Pre-wet Done
signal and once the cement dose is complete the Cement In signal
should be activated.
Dry Mix Time
This is the amount of time to mix the batch after the pre-wet water
has been added and mixed, and the Cement In signal has been
received (if used). After this time, the main water is added.
Wet Mix Time
This is the amount of time to mix after the main water has been
added before signalling Mix Complete.
Using the Next button will give page 2 of the recipe editor screen.
Summary of Contents for Hydro-Control VI
Page 4: ...4 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 6: ...6 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 8: ...8 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 10: ...10 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 18: ...Navigation Chapter 2 18 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 20: ...Plant Operator Controls Chapter 3 20 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 34: ...Editing Recipes Chapter 6 34 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 40: ...Running the First Mix Chapter 7 40 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 56: ...Using Moisture Control Chapter 8 56 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 70: ...Setting Up User Accounts Chapter 11 70 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 72: ...Remote Support Chapter 12 72 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 86: ...Document Cross Reference Appendix C 86 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...