![Hydronix Hydro-Control VI Operator'S Manual Download Page 24](http://html.mh-extra.com/html/hydronix/hydro-control-vi/hydro-control-vi_operators-manual_2192336024.webp)
24 Hydro-Control VI Operators Guide HD0456 Rev 1.7.1
•
Mixes with very little fine material where the addition of cement causes clumping or
‘balling’ of the mix
•
Some SCC admixes
In these situations the Hydro-Control VI can be configured to calculate an amount of water to
add based on a reading with either just aggregates or aggregates and water added. Once
water has been added to a fixed moisture content it is then optional whether an additional
calculation is made to add the main water or whether a pre-set amount of water, scaled for
changes in the dry weight is added. Calibrating recipes is covered in more detail in Chapter 8
Summary of Contents for Hydro-Control VI
Page 4: ...4 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 6: ...6 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 8: ...8 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 10: ...10 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 18: ...Navigation Chapter 2 18 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 20: ...Plant Operator Controls Chapter 3 20 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 34: ...Editing Recipes Chapter 6 34 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 40: ...Running the First Mix Chapter 7 40 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 56: ...Using Moisture Control Chapter 8 56 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 70: ...Setting Up User Accounts Chapter 11 70 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 72: ...Remote Support Chapter 12 72 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...
Page 86: ...Document Cross Reference Appendix C 86 Hydro Control VI Operators Guide HD0456 Rev 1 7 1 ...