Installation and Maintenance Manual
65
Battery Connection Diagram
Connect six wires to the gate operator as shown.
Install batteries as show, observing polarity:
Four 14 gauge wires to the control circuit.
Always connect red wires to (+) and black wires to (-). The exception is
Connect from lug terminals to DC motor:
the jumper wire which connects the two batteries.
Two 6 gauge minimum for 1hp operators
Two 2 gauge minimum for 2hp operators
Summary of Contents for SwingRiser 14
Page 2: ......
Page 18: ...Installation and Maintenance Manual 8 Tools Required for an Efficient Installation ...
Page 19: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Page 20: ...Installation and Maintenance Manual 10 Swing Gate Post Details continued ...
Page 21: ...Installation and Maintenance Manual 11 Swing Gate Post Details continued ...
Page 22: ...Installation and Maintenance Manual 12 HRG 220 Pump Pack ...
Page 23: ...Installation and Maintenance Manual 13 HRG 222 Pump Pack ...
Page 24: ...Installation and Maintenance Manual 14 How Our Hydraulic Swing Gates Work ...
Page 32: ...Installation and Maintenance Manual 22 ...
Page 54: ...Installation and Maintenance Manual 44 Loop Layouts ...
Page 77: ...Installation and Maintenance Manual 67 ...
Page 83: ...Installation and Maintenance Manual 73 Smart Touch Controller Connections ...