Installation and Maintenance Manual
72
Parts Breakout - DC Power Supply
For an up-to-date parts list and numbers, refer to the HySecurity
Price Book
. For more information, refer to the
www.hysecurity.com
website.
Battery charger
Two 12V Batteries
Circuit Breaker
Switch, Disconnect
Terminal, 5-Pole
30A Fuse Block
with a 5A Fuse
30A Fuse
Block with
a 15A Fuse
Terminal, 2-Pole
Vent
Battery Enclosure for two batteries
Summary of Contents for SwingRiser 14
Page 2: ......
Page 18: ...Installation and Maintenance Manual 8 Tools Required for an Efficient Installation ...
Page 19: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Page 20: ...Installation and Maintenance Manual 10 Swing Gate Post Details continued ...
Page 21: ...Installation and Maintenance Manual 11 Swing Gate Post Details continued ...
Page 22: ...Installation and Maintenance Manual 12 HRG 220 Pump Pack ...
Page 23: ...Installation and Maintenance Manual 13 HRG 222 Pump Pack ...
Page 24: ...Installation and Maintenance Manual 14 How Our Hydraulic Swing Gates Work ...
Page 32: ...Installation and Maintenance Manual 22 ...
Page 54: ...Installation and Maintenance Manual 44 Loop Layouts ...
Page 77: ...Installation and Maintenance Manual 67 ...
Page 83: ...Installation and Maintenance Manual 73 Smart Touch Controller Connections ...