Installation and Maintenance Manual
HySecurity
Hydraulic Swing Gate Operator
Table of Contents, continued
Installing Gate Reversing Edge (Contact Type) Sensor ............................................ 39
Installing Photoelectric (Non-Contact) Sensor ................................................... 40 - 41
IV. Detectors and Loops
Loop and Detector Installation Guide .................................................................. 42 - 43
Loop Layouts ......................................................................................................... 44 - 45
Vehicle Detector Installation Options .......................................................................... 46
HySecurity Hy-5A Vehicle Detector Installation ......................................................... 47
Standard 11 Pin Box Type Vehicle Detector Installation ........................................... 48
Vehicle Detector & Loop Fault Diagnostics ................................................................ 49
V. Accessories
24 Hr / 7 Day Time Clock Option .................................................................................. 50
Connecting a Radio Receiver ........................................................................................ 50
VI. Troubleshooting and Maintenance
Troubleshooting .................................................................................................... 51 - 53
General Maintenance ............................................................................................ 54 - 61
Operator Post ............................................................................................................. 54
Hydraulic System ....................................................................................................... 58
Electrical Controls ..................................................................................................... 60
Pressure Relief Valve Adjustments and Maintenance Schedule ........................... 61
VII. DC Operators
DC Systems (HRG 220 DC & HRG 222 DC)
Important Notes about DC Powered Gates ................................................................. 63
Wiring & Control Configurations ................................................................................. 64
Battery Connection Diagram ........................................................................................ 65
VIII. Appendix
Wiring Size Schedules ........................................................................................... 66 - 67
Parts Breakout Diagrams ...................................................................................... 68 - 72
Smart Touch Controller Connections. ....................................................................... .73
Limited Warranty ........................................................................................................... 75
Summary of Contents for SwingRiser 14
Page 2: ......
Page 18: ...Installation and Maintenance Manual 8 Tools Required for an Efficient Installation ...
Page 19: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Page 20: ...Installation and Maintenance Manual 10 Swing Gate Post Details continued ...
Page 21: ...Installation and Maintenance Manual 11 Swing Gate Post Details continued ...
Page 22: ...Installation and Maintenance Manual 12 HRG 220 Pump Pack ...
Page 23: ...Installation and Maintenance Manual 13 HRG 222 Pump Pack ...
Page 24: ...Installation and Maintenance Manual 14 How Our Hydraulic Swing Gates Work ...
Page 32: ...Installation and Maintenance Manual 22 ...
Page 54: ...Installation and Maintenance Manual 44 Loop Layouts ...
Page 77: ...Installation and Maintenance Manual 67 ...
Page 83: ...Installation and Maintenance Manual 73 Smart Touch Controller Connections ...