HAIXING
Chapter3 Putting Into
Operation
3-12
Attention!
The bolt shall be firmly tightened to avoid mould dropping
at the opening of the platens.
ข้อควรระวัง
!
สลักเกลียวควรไขให้แน่นเพื่อไม่ให้แม่พิมพ์ตกลงที่ช่องเปิดของแผ่น
Step14: Remove the belt or steel cable used during the lifting and setting.
Step15: Set up each position, pressure and speed for the mould- opening and
closing, especially set up a high pressure for the mould locking that is
required by the product molding.
Step16: Start the oil pump motor.
Step17: Open the mould to extremity; adjust Mould 1 slow position bigger
than high-pressure position of the mould closure.
Step18: Set the data of mould opening/closure and mould adjustment.
Step19: Close the safety door, push secondarily mould-adjustment function
key to enter the automatic mould-adjustment status.
Step20: Once again open and close the safety door, at which the machine will
Summary of Contents for M16
Page 34: ...HAIXING Chapter2 Safety 2 3 ...
Page 35: ...HAIXING Chapter2 Safety 2 4 ...
Page 36: ...HAIXING Chapter2 Safety 2 5 ...
Page 37: ...HAIXING Chapter2 Safety 2 6 配 电 箱 空气 开 关 上 按钮箱上 动模板前方中间 ...
Page 38: ...HAIXING Chapter2 Safety 2 7 标牌样本 安装位置 ...
Page 39: ...HAIXING Chapter2 Safety 2 8 后安全门上 前安全门上 料筒罩上 2 1 2 Maintenance and repair work ...