Absolute Encoder AMP(H) 41
AMP(H)41_MANUAL-en_R11 - 2019-03-28
87
12
Replacing the Measuring System
The following points must be noted when replacing the measuring system:
●
The new measuring system must have the same order number as the measuring system
being replaced; any deviations must be expressly clarified with Johannes Hübner Giessen.
●
It must be ensured that the PROFIBUS address set via hardware switch for the new
measuring system matches the previous PROFIBUS address.
●
If a bus termination was provided for the measuring system being replaced, this must also be
provided for the new measuring system.
●
The new measuring system must be installed in accordance with the specifications and
requirements in chapter 4 “Assembly“ on page 20.
●
The new measuring system must be connected in accordance with the specifications
in chapter 5.3 “Connection“ on page 28.
●
As the F-Parameters and iParameters of the measuring system are stored in the safety
program of the control, the new measuring system is parameterized with the projected
settings in the start-up phase.
●
When recommissioning the replaced measuring system, correct functioning must be ensured
first of all by means of a protected test run.
Summary of Contents for AMP 41
Page 96: ...96 AMP H 41_MANUAL en_R11 2019 03 28 Absolute Encoder AMP H 41 16 3 T V certificate...
Page 97: ...Absolute Encoder AMP H 41 AMP H 41_MANUAL en_R11 2019 03 28 97 16 4 PROFIBUS DP certificate...
Page 98: ...98 AMP H 41_MANUAL en_R11 2019 03 28 Absolute Encoder AMP H 41 16 5 PROFIsafe certificate...