![Hubner AMP 41 Operating And Assembly Instructions Manual Download Page 52](http://html1.mh-extra.com/html/hubner/amp-41/amp-41_operating-and-assembly-instructions-manual_2180893052.webp)
52
AMP(H)41_MANUAL-en_R11 - 2019-03-28
Absolute Encoder AMP(H) 41
Install
JHG_iParameter
by means of the setup file “JHG_iParameter_setup.exe”.
Start
JHG_iParameter
by means of the start file "JHG_iParameter.exe", then open the
template file provided with the measuring system with the menu
File
Open XML tem-
plate
(as example here: AMP41_001.xml).
Modify the relevant parameters if necessary, then click on the
Generate CRC
switch for the
F_iPar_CRC
calculation.
Each parameter change requires a new
F_iPar_CRC
calculation, which must then be taken
into account in the projection. If a safety program is already present, it must be re-generated.
For further information on the use of
JHG_iParameter
, refer to the help file with the menu
Info
Help
.
Summary of Contents for AMP 41
Page 96: ...96 AMP H 41_MANUAL en_R11 2019 03 28 Absolute Encoder AMP H 41 16 3 T V certificate...
Page 97: ...Absolute Encoder AMP H 41 AMP H 41_MANUAL en_R11 2019 03 28 97 16 4 PROFIBUS DP certificate...
Page 98: ...98 AMP H 41_MANUAL en_R11 2019 03 28 Absolute Encoder AMP H 41 16 5 PROFIsafe certificate...