![Hubner AMP 41 Operating And Assembly Instructions Manual Download Page 19](http://html1.mh-extra.com/html/hubner/amp-41/amp-41_operating-and-assembly-instructions-manual_2180893019.webp)
Absolute Encoder AMP(H) 41
AMP(H)41_MANUAL-en_R11 - 2019-03-28
19
3
Transport, packaging and storage
NOTES!
Shipping information
–
Do not drop the device or subject it to heavy impacts!
The device contains an optical system.
–
Use only the original packaging.
Inappropriate packaging material may cause damage to the unit in transit.
–
Storage temperature: -30 °C...+60 °C
–
Store in a dry place.
3.1
Safety instructions for transport
NOTICE!
Material damage caused by improper transport!
Observe the symbols and information on the packaging:
–
Do not throw – risk of breakage
–
Keep dry
–
Do not expose to heat above 40°C or direct sunlight.
3.2
Incomings goods inspection
Check delivery immediately upon receipt for completeness and possible transport damage.
Inform the forwarder directly on receipt of the goods about existing transport damages (prepare
pictures for evidence).
3.3
Packaging / disposal
The packaging is not taken back and must be disposed of in accordance with the respective
statutory regulations and local guidelines.
3.4
Storage of packages (devices)
Keep dry
Keep packages dry and free from dust; protect from moisture
Protect against heat
Protect packages from heat above 40° C and direct sunlight
If you intend to store the device for a longer period of time (> 6 months) we recommend you
use protective packaging (with desiccant).
NOTES!
Turn the shaft of the device every 6 month to prevent the bearing grease
solidifying!
Summary of Contents for AMP 41
Page 96: ...96 AMP H 41_MANUAL en_R11 2019 03 28 Absolute Encoder AMP H 41 16 3 T V certificate...
Page 97: ...Absolute Encoder AMP H 41 AMP H 41_MANUAL en_R11 2019 03 28 97 16 4 PROFIBUS DP certificate...
Page 98: ...98 AMP H 41_MANUAL en_R11 2019 03 28 Absolute Encoder AMP H 41 16 5 PROFIsafe certificate...