Figure 4-13 Installing a server on holding rails
– Ensure that the inner rail is clipped into the middle rail, and then slowly push the
chassis inside until you hear a click, as shown in (1) in
.
– If the inner rail is not clipped into the middle rail, the rolling balls and the holding
rail may be damaged, as shown in (2) and (3) in
.
Figure 4-14 Clipping the inner rail into the middle rail
4. Press the release levers on both sides, and push the server into the cabinet
until the server cannot move forward, as shown in
.
TaiShan X6000 Server
User Guide
4 Installing the X6000
Issue 04 (2020-06-05)
Copyright © Huawei Technologies Co., Ltd.
44