Step 3 Install the X6000.
1. Lift the X6000 on both sides. This task requires at least three persons.
2. Place the X6000 on the guide rails and push it into the cabinet. See (1) in
.
Figure 4-7 Installing the X6000
3. When the two mounting ears on the X6000 contact the mounting bars on the
cabinet, tighten the captive screws on the mounting ears to secure the X6000.
.
Step 4 After the installation is complete, connect a network cable, a VGA cable, or USB
devices as required. Connect the power cables and power on the X6000.
----End
4.4.2 Installing the Adjustable Guide Rails and Chassis
Adjustable guide rails are for cabinets where the distance between the front and
rear mounting bars is 543.5–848.5 mm (21.40–33.41 in.).
Procedure
Step 1 Install adjustable guide rails.
1. Place a guide rail horizontally in the planned position while keeping the guide
rail in contact with the mounting bars in the cabinet, and hook the guide rail
to the cabinet. See (1) in
The three holes for installing the guide rail should be within a 1U mark.
2. Insert the plugs (delivered with the server) into the following two square
holes to secure the guide rail. See (2) in
.
TaiShan X6000 Server
User Guide
4 Installing the X6000
Issue 04 (2020-06-05)
Copyright © Huawei Technologies Co., Ltd.
38