Figure 4-9 Installing the X6000
3. When the two mounting ears on the X6000 contact the mounting bars on the
cabinet, tighten the captive screws on the mounting ears to secure the X6000.
.
Step 3 After the installation is complete, connect a network cable, a VGA cable, or USB
devices as required. Connect the power cables and power on the X6000.
----End
4.4.3 Installing the Holding Rails and Chassis
Holding rails are for cabinets where the distance between the front and rear
mounting bars is 610–914 mm (24.02–35.98 in.).
Procedure
Step 1 Install holding rails.
1. Press down on the spring at the front end of the holding rail and pull out the
.
2. Insert the positioning pins into square holes at the rear of the cabinet. See (3)
in
.
3. Align the front end of the rail with a square hole, and push the holding rail
forward until it snaps into place. See (4) in
.
4. Push the hook backward until the metal sheet is in contact with the post. See
.
5. Optional: Install an M6 screw into the third square hole at the rear of the
holding rail to secure it. See (6) in
TaiShan X6000 Server
User Guide
4 Installing the X6000
Issue 04 (2020-06-05)
Copyright © Huawei Technologies Co., Ltd.
40