Figure 4-12 Installing an inner rail
3. Lift the server, align the inner rails with the holding rails, and push the server
into the cabinet, as shown in
.
At least three people are required to lift the server from both sides.
TaiShan X6000 Server
User Guide
4 Installing the X6000
Issue 04 (2020-06-05)
Copyright © Huawei Technologies Co., Ltd.
43