Figure 3-20 Placing the cabinet
1. Place the cabinet on the base and align the mounting holes in the cabinet
with those in the base.
2. Insert the M12x80 assembly bolts into the holes in the cabinet and base, and
partially tighten the bolts, as shown in
.
Step 7 Adjust the levelness and verticality of the cabinet by raising or lowering the
leveling feet.
Step 8 Secure the cabinet.
1. Install the spring washer, large flat washer, and insulation tube on each bolt
properly.
2. Use the torque wrench (M20) to tighten the four bolts to a torque of 45 N m
in diagonal order, as shown in
.
NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm Width)
3 Installation Guide
Issue 17 (2020-10-22)
Copyright © Huawei Technologies Co., Ltd.
48