About This Document
Purpose
This document describes the iMaster NetEco hardware in terms of installation,
cable connection, commissioning, and maintenance in the data center scenario.
NO TE
● This document does not describe the installation of the uninterruptible power system
(UPS), smart cooling product, and power distribution unit (PDU). By default, the UPS,
smart cooling product, and PDU have been installed and commissioned.
● Figures in this document are for reference only. The actual products may vary.
● For details about iMaster NetEco software commissioning, see
iMaster NetEco Product
Documentation (DC) (V600R021C10_xx)
.
Intended Audience
This document is intended for:
●
Hardware installation engineers
●
Commissioning engineers
●
Maintenance engineers
●
Technical support engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol
Description
Indicates a hazard with a high level of risk which, if not
avoided, will result in death or serious injury.
Indicates a hazard with a medium level of risk which, if not
avoided, could result in death or serious injury.
Indicates a hazard with a low level of risk which, if not
avoided, could result in minor or moderate injury.
iMaster NetEco
Device Installation and Commissioning Guide (Data
Center)
About This Document
Issue 02 (2021-05-12)
Copyright © Huawei Technologies Co., Ltd.
ii