Figure 6-20 iBOX
(1) Networking switch
(2) ALM indicator
(3) RF_Z indicator
Step 2 Hold down the iBAT networking switch for 2 seconds. When the RUN/ALM
indicator turns from steady red to blinking green at short intervals, and finally to
blinking green at long intervals, the iBAT connects to the iBOX network.
NO TE
● It is recommended that iBATs be networked from the positive battery string terminal
according to the battery cable connection sequence.
● The sequence of connecting the iBAT to the iBOX determines the battery number.
Step 3 Perform networking operations on the next iBAT only after networking for the
previous iBAT is successful. Repeat
to add other iBATs to the iBOX network.
Step 4 Hold down the networking switch on the iBOX for 2 seconds. When the RF_Z
indicator on the iBOX turns from blinking green at super short intervals to blinking
green at long intervals, the networking is complete.
NO TE
After the networking is complete, if the ALM indicator on the iBOX is steady on, the
number of devices online is smaller than the value of iBAT number of iBOX. Check that
iBAT number of iBOX is set to a correct value and that the iBATs are successfully
networked (The RUN/ALM indicator is blinking green at long intervals.).
Step 5 (Optional) If multiple iBOXs are cascaded, repeat
to perform
networking for other iBOXs and iBATs.
----End
6.4.2 Adding a Video Management System
NO TE
● Because cameras and the IVS do not support northbound and southbound isolation, the IVS
service IP address must be set to a northbound IP address.
● The camera IP address and the IVS service IP address must be in the same network.
● For details about the northbound IP address, see "Overview of Southbound and Northbound
Network Isolation" in
iMaster NetEco Product Documentation (DC) (V600R021C10_xx)
.
iMaster NetEco
Device Installation and Commissioning Guide (Data
Center)
6 Adding Devices
Issue 02 (2021-05-12)
Copyright © Huawei Technologies Co., Ltd.
167