1 Commissioning Preparations
Airbridge BTS3606E&3606AE
System Commissioning Guide
1-2
Huawei Technologies Proprietary
Issue 02 (2006-10-10)
1.1 BTS Equipment
Before commissioning, ensure that:
z
The cabinet and its components are installed correctly.
z
The antenna system is installed and connected.
z
The transmission equipment is connected.
z
The BTS O&M software and operational software are installed.
z
The power system is installed.
z
The equipment for monitoring the equipment room environment is installed. (optional)
1.2 Tools for Commissioning
Table 1-1 lists the tools for BTS commissioning.
Table 1-1
Tools for BTS commissioning
Tool
Quantity
Remark
CDMA MS
Two
Mandatory
Qualcomm CAIT or a BLUEROSE
One
Mandatory
RS NRT-Z44 power meter
One
Optional
SiteMaster 331A
One
Mandatory
30 dB low-power coaxial attenuator
One
Optional
20 dB low-power coaxial attenuator
Two
Optional
DIN-male to N-female adapter
One
Optional
1.3 Personnel
Huawei technical support engineers and the engineers representing the customers complete
the system commissioning together. The customer representative should sign the acceptance
list after the commissioning is complete.
1.4 Site Information
To facilitate the preparation of commissioning tools and commissioning schemes, collect the
following basic information before you start the commissioning of the BTS:
z
BTS ID