System Commissioning Guide
3 Commissioning Process
Issue 02 (2006-10-10)
Huawei Technologies Proprietary
3-1
3
Commissioning Process
About This Chapter
The following table lists the contents of this chapter.
Title
Description
3.1 Commissioning Flowchart
Describes the BTS commissioning process and
operation tasks in terms of flowchart.
3.2 BTS Startup Process
Describes the general procedure for starting the BTS.
3.3 Starting Local Maintenance
Describes the procedure for starting local
maintenance.
3.5 O&M Test
Describes the procedure of O&M commissioning.
3.6 RF Performance Test
Describes the procedure of the commissioning of the
RF specifications.
3.6 Service Function Test
Describes the procedure of service function
commissioning