Airbridge BTS3606E&3606AE
System Commissioning Guide
3 Commissioning Process
Issue 02 (2006-10-10)
Huawei Technologies Proprietary
3-31
No. Status of
Adjacent
Cell
Status of
Destination
Sector
Status of MS
Distance from the
MS to the BTS
4 100%
loaded
50%
loaded
Static
Short
5 100%
loaded
50%
loaded
Static
Long
6
100% loaded
50% loaded
Moving at 15 km/h,
30 km/h, and 70 km/h
Short
7
100% loaded
50% loaded
Moving at 15 km/h,
30 km/h, and 70 km/h
Long
Step 5
Check that the downlink rate of data services is stable.
----End