1 Commissioning Preparations
Issue 02 (2006-10-10)
Huawei Technologies Proprietary
1-1
1
Commissioning Preparations
About This Chapter
The following table lists the contents of this chapter.
Title
Description
1.1 BTS Equipment
Describes the BTS equipment to be verified before
commissioning.
1.2 Tools for Commissioning
Describes the tools involved in commissioning.
1.3 Personnel
Describes the personnel required for commissioning.
1.4 Site Information
Describes the site information to be collected before
commissioning.
1.5 Data Configuration Files
Described the requirements for data configuration files.