3 Commissioning Process
Airbridge BTS3606E&3606AE
System Commissioning Guide
3-22
Huawei Technologies Proprietary
Issue 02 (2006-10-10)
Figure 3-8
Connection for forward power test
TX2/RX2
-
ANT
TX2/RX2
-
TEST
TX1/RX1
-
ANT
TX1/RX1 - TEST
CDDU
BTS
cabinet top
Power
meter
Antenna
Step 2
In the Windows operating system of the LMT, select
Start
>
Run
, type
Telnet
xxx.xxx.xxx.xxx
in the
Run
dialog box, and then press
Enter
to start Telnet.
For the near end Telnet, the default IP address of the Ethernet port is 172.16.16.16.
Step 3
Start the power test for the BTS transmitting at full power.
For example, for the 450A carrier, execute the following commands:
HW CBTS>str trmpowertst:brdid=2,chid=0,channo=210
Are you sure?(Y or N)y
Ok
HW CBTS>str trmpowertst:brdid=2,chid=1,channo=160
Are you sure?(Y or N)y
Ok
HW CBTS>str trmpowertst:brdid=2,chid=2,channo=260
Are you sure?(Y or N)y
Ok
z
"chid" is the ID of a carrier provided by the TRM. The IDs of the carriers provided by the
CMTR/OMTR are 0, 1, and 2.
z
"channo" is the center frequency of the carrier.
z
You must test the powers of the three carriers of the CMTR/OMTR at the same time.
Step 4
After preheating the BTS for ten minutes, check the output power that is displayed on the
power meter and record the value.
Step 5
Analyze the test result.
See section 3.5.2 "Forward Power Test Analysis."
If the result is abnormal, handle the situation according to section 3.5.2 "Forward Power Test
Analysis."