Airbridge BTS3606E&3606AE
System Commissioning Guide
Tables
Issue 02 (2006-10-10)
Huawei Technologies Proprietary
v
Tables
Table 1-1
Tools for BTS commissioning ............................................................................................................1-2
Table 3-1
Symptom of board initialization .........................................................................................................3-4
Table 3-2
Indicator status during the OML setup ...............................................................................................3-6
Table 3-3
Indicator status when the BTS downloads data configuration files....................................................3-7
Table 3-4
Parameter associated with the forward power test............................................................................3-23
Table 3-5
Parameters associated with the reverse RSSI test.............................................................................3-26
Table 3-6
Conditions for testing the packet data downlink rate of a user.........................................................3-30
Table 4-1
Handling board alarms........................................................................................................................4-2