6.417.999.120
Issued 06/2005
6.15
Inspection and maintenance work
VK 5012
6.5.4
Lubricating the wire guide rollers of the twising unit
Interval: 40 operating hours
• With the press ram in the rear limit position
- Open the service door (7) on the twisting unit
- Unscrew the eye bolts on the twisting unit and swivel it through 90
°
• The wire guide rollers (18) are now visible
- Lubricate each of the 8 wire guide rollers until grease emerges
- Swing the twisting unit back towards the press and tighten the bolts
(see table for tightening torque)
- Close the service door again
18
7
Summary of Contents for VK 5012
Page 16: ...6 417 999 120 Issued 06 2005 General information VK 5012 2 4 ...
Page 17: ...6 417 999 120 Issued 06 2005 VK 5012 Technical data 3 1 3 Technical data 3 1 Dimensions ...
Page 24: ...6 417 999 120 Issued 06 2005 Technical data VK 5012 3 8 ...
Page 28: ...6 417 999 120 Installation VK 5012 Issued 06 2005 4 4 ...
Page 64: ...6 417 999 120 Installation VK 5012 Issued 06 2005 5 36 ...
Page 92: ...Spare parts and accessories VK 5012 6 417 999 120 Issued 06 2005 7 2 ...
Page 94: ......
Page 95: ......
Page 96: ......