6.417.999.120
VK 5012
Installation
Issued 06/2005
5.3
5.2.3
Ready
The green
“Ready”
lamp lights up when the baling press is ready for operation.
Preconditions:
• The main switch is on
• The emergency stop button has not been pressed
• All protective and inspection doors are closed
• The pre-compactor is in its initial position
• No faults are indicated
5.2.4
Motor
The white
“Motor”
lamp lights up when the main pump is in operation.
5.2.5
Service hours meter
The meter counts the hours during which the press is operated. It counts both
manual and automatic mode operation.
5.2.6
Set-up
Turn the key-operated
“Set-up”
switch to the I position.
Individual movements of the machine can be actuated step-by-step by pressing the
F1
÷
F8 buttons on the auxiliary operating panel.
See appendix: Operator panel OP 17.
Summary of Contents for VK 5012
Page 16: ...6 417 999 120 Issued 06 2005 General information VK 5012 2 4 ...
Page 17: ...6 417 999 120 Issued 06 2005 VK 5012 Technical data 3 1 3 Technical data 3 1 Dimensions ...
Page 24: ...6 417 999 120 Issued 06 2005 Technical data VK 5012 3 8 ...
Page 28: ...6 417 999 120 Installation VK 5012 Issued 06 2005 4 4 ...
Page 64: ...6 417 999 120 Installation VK 5012 Issued 06 2005 5 36 ...
Page 92: ...Spare parts and accessories VK 5012 6 417 999 120 Issued 06 2005 7 2 ...
Page 94: ......
Page 95: ......
Page 96: ......