6.417.999.120
Installation
VK 5012
Issued 06/2005
5.26
- Turn on the main switch
- Perform strapping manually using the key-operated
“Bale ready”
switch once a
minimum bale length of approx. 400 mm is reached.
- Turn the
“Bale ready”
switch briefly to the right
• Display text: Bale length reached
- Press the
“Forward”
button.
• The press ram moves forwards and stops under pressure. The press ram lock
cylinders move forward and the wire insertion cylinders push the wire through the
channels of the press ram to the twisting unit. The twisting rods perform one rotation
and catch the wires. The shears in the twisting unit cut the wires, which are
immediately twisted. The wire insertion cylinders return to their initial position. The
press ram returns to its initial position and the twisting rods perform several
backward rotations to eject the wire ends.
- Release and remove the cut wire ends from the twisting and insertion side of the
press frame.
Summary of Contents for VK 5012
Page 16: ...6 417 999 120 Issued 06 2005 General information VK 5012 2 4 ...
Page 17: ...6 417 999 120 Issued 06 2005 VK 5012 Technical data 3 1 3 Technical data 3 1 Dimensions ...
Page 24: ...6 417 999 120 Issued 06 2005 Technical data VK 5012 3 8 ...
Page 28: ...6 417 999 120 Installation VK 5012 Issued 06 2005 4 4 ...
Page 64: ...6 417 999 120 Installation VK 5012 Issued 06 2005 5 36 ...
Page 92: ...Spare parts and accessories VK 5012 6 417 999 120 Issued 06 2005 7 2 ...
Page 94: ......
Page 95: ......
Page 96: ......