![HSM VK 5012 Operating Manual Download Page 25](http://html1.mh-extra.com/html/hsm/vk-5012/vk-5012_operating-manual_2177769025.webp)
6.417.999.120
VK 5012
Installation
Issued 06/2005
4.1
Attach 4 shackles and 4 steel cables
4
Installation
4.1
Transport
Proceed with particular care during the transport of the channel baling press to
prevent damage caused by the application of force or careless loading and
unloading. For loading and unloading, the whole channel baling press may be lifted
with a hoist (crane or fork-lift) only at the pick-up points.
Warning!
The allowed load of the hoist must be higher than the weight of the
baling press resp. the particular components of the press.
By unloading from a lorry by means of a crane or a fork-lift observe
balance!
If the baling press had been run-in already, the weight of the
compressed material must be additionally considered.
Weight ~ 9500 kg
Necessary slinging equipment
4 steel cables at least 8 m in length
4 shackles with DIN 82 101 type A studs
Summary of Contents for VK 5012
Page 16: ...6 417 999 120 Issued 06 2005 General information VK 5012 2 4 ...
Page 17: ...6 417 999 120 Issued 06 2005 VK 5012 Technical data 3 1 3 Technical data 3 1 Dimensions ...
Page 24: ...6 417 999 120 Issued 06 2005 Technical data VK 5012 3 8 ...
Page 28: ...6 417 999 120 Installation VK 5012 Issued 06 2005 4 4 ...
Page 64: ...6 417 999 120 Installation VK 5012 Issued 06 2005 5 36 ...
Page 92: ...Spare parts and accessories VK 5012 6 417 999 120 Issued 06 2005 7 2 ...
Page 94: ......
Page 95: ......
Page 96: ......