After performing the installation or maintenance procedure, slide the server back into the rack, and then
press the server firmly into the rack to secure it in place.
7.
Do one of the following:
• In a server that uses thumbscrew rack ears, tighten the captive thumbscrews.
• In a server that uses quick-release latch rack ears, if necessary, tighten the shipping screws.
8.
Connect each power cord to the server.
9.
Connect all peripheral cables to the server.
10.
Power up the server.
28
Removal and replacement procedures
Summary of Contents for ProLiant DL20
Page 12: ...12 Customer self repair...
Page 13: ...Customer self repair 13...
Page 14: ...14 Customer self repair...
Page 43: ...b Remove the fan cage c Remove the fan module Fan 1 Removal and replacement procedures 43...
Page 59: ...8 Remove the expansion board Slot 1 Slot 2 Removal and replacement procedures 59...
Page 89: ...Fan locations Fan locations 89...
Page 96: ...Four bay SFF hot plug configuration Two bay LFF non hot plug configuration 96 Cabling...