7.
After all target maps have been created, the newly created WWNs can be added to the zone
that you created in
Step 4
.
Figure 118 3PAR MPX zoning — FCoE
8.
Use the InForm Management Console to provision LUNs to the MPX200 host.
9.
You can now use the mpx Manager LUN Presentation Wizard for LUN presentation to the
initiator.
140 MPX200 FCoE feature description