50
Installation
3. Locate a place on the rack columns with the available space required
for the installation of the storage device. The storage device and the
rail kit require 3 EIA units of space.
Use the following table as a guide for placement of the rails in a Rack System/E
where multiple disk systems will be installed. You can rack multiple disk systems
without gaps installing rails every three EIA units. For example, starting at the
bottom of a 2-meter rack, set rails at the following unit/hole locations:
Table 7
Rail Positions for Sequential Disk Systems
Disk Systems
Hole from Rack Bottom
One 1
Two
4
Three
7
Four
10
Five
13
Six
16
Seven
19
Eight
22
Nine
25
Ten
28
Eleven
31
Summary of Contents for StorageWorks 2300 - Disk System
Page 1: ...hp StorageWorks disk system 2300 Edition E0902 user s guide ...
Page 10: ...10 ...
Page 14: ...14 Product Description ...
Page 35: ...Installation 35 Installation 2 ...
Page 40: ...40 Installation ...
Page 41: ...Installation 41 Installation ...
Page 48: ...48 Installation ...
Page 58: ...58 Installation ...
Page 59: ...Installation 59 Installation 4 Install clipnuts as shown in Figure 28 ...
Page 76: ...76 Installation ...
Page 77: ...Installation 77 Installation ...
Page 83: ...Configuration 83 Configuration 3 ...
Page 86: ...86 Configuration ...
Page 94: ...94 Configuration ...
Page 95: ...Troubleshooting 95 Troubleshooting 4 ...
Page 108: ...108 Removal and Replacement ...
Page 132: ......
Page 134: ......
Page 140: ......
Page 150: ...150 Reference E VCCI Statement Japan Harmonics Conformance Japan F BCIQ EMC Statement Taiwan ...
Page 151: ...Reference 151 Reference G Declaration of Conformity ...
Page 158: ...158 ...