Hardware options installation 55
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Extend the server from the rack (on page
33
).
5.
Remove the access panel (on page
31
).
6.
Remove the air baffle (on page
33
).
7.
Remove the fan cage (on page
36
).
CAUTION:
When routing cables, always be sure that the cables are not in a position where they
can be pinched or crimped.
8.
Install the SID module into the front panel, and then secure the SID module to the chassis with the screws
from the kit.
9.
Route and connect the SID module cable to the system board.
o
LFF configuration
Summary of Contents for ProLiant ML350 Gen9
Page 21: ...Component identification 21 SFF drives o Tower orientation o Rack orientation LFF drives ...
Page 40: ...Operations 40 o LFF model Use a flathead screwdriver to remove the blank from the box ...
Page 122: ...Cabling 122 LFF media cage data cabling Optical device cabling SFF configuration ...
Page 126: ...Cabling 126 HP Smart Storage Battery cabling Power supply backplane cabling GPU power cabling ...
Page 128: ...Cabling 128 Embedded SATA cabling LFF configuration SFF configuration ...
Page 131: ...Cabling 131 o SFF configuration o LFF configuration ...
Page 162: ...Support and other resources 162 ...
Page 163: ...Support and other resources 163 ...