Hardware options installation 51
10.
Install the server base blank covers over the server base feet holes.
11.
Turn the server over, and then remove the access panel (on page
31
).
12.
Remove the air baffle (on page
33
).
13.
Remove the fan cage (on page
36
).
14.
Locate the system maintenance switch on the system board.
15.
Configure position 10 of the system maintenance switch to ON for a rack configuration.
Summary of Contents for ProLiant ML350 Gen9
Page 21: ...Component identification 21 SFF drives o Tower orientation o Rack orientation LFF drives ...
Page 40: ...Operations 40 o LFF model Use a flathead screwdriver to remove the blank from the box ...
Page 122: ...Cabling 122 LFF media cage data cabling Optical device cabling SFF configuration ...
Page 126: ...Cabling 126 HP Smart Storage Battery cabling Power supply backplane cabling GPU power cabling ...
Page 128: ...Cabling 128 Embedded SATA cabling LFF configuration SFF configuration ...
Page 131: ...Cabling 131 o SFF configuration o LFF configuration ...
Page 162: ...Support and other resources 162 ...
Page 163: ...Support and other resources 163 ...