POST and boot specifications
When the switch is powered on or rebooted, the switch performs POST. Total boot
time with POST is at least three minutes.
Use
fastboot
to bypass POST after subsequent reboots. For more information about
the
fastboot
command, refer to the
Fabric OS command reference manual
for the
Fabric OS version running on your switch.
POST
POST is a system check that is performed each time the switch is powered on, rebooted,
or reset. During POST, the LEDs flash different colors. Any errors that occur during
POST appear in the error log.
Monitor POST diagnostic tests via the error log or the CLI. The POST process consists of:
•
Displaying preliminary POST diagnostics
•
Initializing the operating system
•
Initializing the hardware
•
Performing diagnostic tests that check several functions, including circuitry, port
functionality, memory, statistics counters, and serialization
Boot
Boot completes in approximately three minutes during POST. The boot process consists of:
•
Defining the universal port configuration set
•
Initializing the links
•
Analyzing the fabric
If any ports are connected to other switches, the switch participates in a fabric
configuration.
•
Assigning domain IDs and port addresses
•
Constructing the unicast routing tables
•
Enabling normal port operation
88
Managing SAN Switches
Summary of Contents for AA-RWF3A-TE
Page 1: ...HP StorageWorks SAN Switch installation guide Part number AA RWF3A TE Fifth edition May 2007 ...
Page 7: ...Supported HBAs 145 Glossary 147 Index 157 SAN Switch installation guide 7 ...
Page 10: ...10 ...
Page 64: ...64 Installing and configuring SAN Switches ...
Page 90: ...90 Managing SAN Switches ...
Page 117: ...Japanese notice Korean notices SAN Switch installation guide 117 ...
Page 146: ...146 SAN Switch technical specifications ...
Page 156: ...156 Glossary ...