Installation and safety considerations
Install the switch using one of the following methods:
•
As a stand-alone unit on a flat surface. See
Installing the switch as a stand-alone
device
on page 40.
•
HP highly recommends mounting the switch in one of the following HP customized
racks:
• HP System/e Rack
• HP 10000 G2 Series Rack, HP 9000 Series Rack and HP 10000 Series Rack
See
Installing the switch using the SAN Switch Rack Mount Kit
on page 41 for detailed
instructions.
Electrical considerations
For successful installation and operation of the switch, ensure that the following electrical
requirements are met. For power supply information, see
SAN Switch technical
specifications
on page 131.
•
Primary AC input 100–240 VAC, 2.0 A, 47–63 Hz (switch autosenses input
voltage)
•
A correctly wired primary outlet, with a circuit protected by a circuit breaker and
grounded in accordance with local electrical codes
•
Adequate supply circuit, line fusing, and wire size, as specified by the electrical
rating on the switch nameplate
Environmental considerations
Before installing the switch:
•
To ensure adequate cooling, install the switch with the nonport side (which
contains the air intake vents) facing the cool-air aisle.
•
Verify that a minimum of 24 cubic ft/minute of airflow is available to the air
intake vents on the nonport side of the switch.
•
Verify that the ambient air temperature does not exceed 40 ºC (104 ºF) while
the switch is operating.
38
Installing and configuring SAN Switches
Summary of Contents for AA-RWF3A-TE
Page 1: ...HP StorageWorks SAN Switch installation guide Part number AA RWF3A TE Fifth edition May 2007 ...
Page 7: ...Supported HBAs 145 Glossary 147 Index 157 SAN Switch installation guide 7 ...
Page 10: ...10 ...
Page 64: ...64 Installing and configuring SAN Switches ...
Page 90: ...90 Managing SAN Switches ...
Page 117: ...Japanese notice Korean notices SAN Switch installation guide 117 ...
Page 146: ...146 SAN Switch technical specifications ...
Page 156: ...156 Glossary ...