2.3
Installing the boiler
2.3.1 Installing the bottom section
i
Mark the position of the bottom section.
Refer to Chapter 3.5 for the minimum wall
clearances.
1. Position the bottom section at the point marked.
2. Place the 4 green metal plates over the 4 red
rubber plates; under each of the adjustable feet.
Use the 4 adjustable feet to align the bottom section
horizontally.
3. The insulation has a perforated opening on each
side to make it easier to expose the burner aperture.
Remove the insulation over the aperture on the left
side (later, it can be clamped between the casing and
the heat exchanger).
4. Remove the ash screw (4, Figure 04) – otherwise, it
will not be possible to install the burner!
- Release the vertical screw (4a) (Torx T25) on the
underside of the ash screw tube.
- Remove the bearing (4b).
- Pull the ash screw out (4) of the bottom section.
4a
4b
4
Figure 04
2.3.2 Changing the boiler door attachment side
(Option)
It is possible to change the boiler door attachment side,
allowing the door to be opened to the left. This may be
advantageous where space is restricted.
Proceed as follows:
1. Release the two screws (1, Figure 05) on the frame.
2. Loosen the two palm grips of the boiler door (2).
3.
Turn the boiler door through 180° and position it so
that the hinge points towards the left.
4. Roughly position the door with the palm grips (2)
before fixing it in place with the screws (1).
1
1
2
2
Figure 05
Make sure that the boiler door closes
tight! The system will not operate if the
boiler door does not seal tight, as it will
not be possible to generate the necessary
vacuum in the combustion chamber!
8
4 211 326 / 01
InSTALLATIOn
Summary of Contents for 30-BioLyt 13