
128
9.3.3 Lubrication points on
spraying boom BoomControl-
Plus (optional)
¾
3 lubrication points identical on either side (=
6 lubrication points in total!)
¾
Lubricate regularly after approx. 50 - 100 hours.
9.4 Drawbar
DANGER!
For reasons of road safety replace a
damaged drawbar immediately with a
new one.
Repairs must only be carried out in the manu-
facturing plant.
Welding work and drilling on the drawbar is
prohibited for safety reasons.
Lubricate the drawbar at regular intervals.
9.5 High pressure cleaner
(optional)
¾
Use 0.415 kg of “AGIP GAMMA 30” for oil
filling.
¾
First oil change after 50 operating hours
¾
Further oil changes every 500 operating hours
Summary of Contents for Leeb 6 GS
Page 4: ......
Page 6: ......
Page 123: ...123 Fig 9 3 1a Fig 9 3 1 c Fig 9 3 1 d Fig 9 3 1 f Fig 9 3 1b Fig 9 3 1 e...
Page 140: ...140 Diagram a with example...
Page 147: ...147...
Page 152: ......
Page 153: ......