MAN1106-07-EN_XL+_UserManual
M a y 6
t h
, 2 0 2 0
P a g e 17 | 192
Once the panel design has been completed using the criteria and suggestions in the following
sections, use the following steps to panel mount the XL+ OCS.
1.
The XL+ allows unique installation options that simplify installation for systems that may
not need robust vibration or water resistance.
2.
If the system does not experience shock or vibration and will not be exposed to weather
or wash down conditions, the unit can be installed by cutting the rectangular opening
and installing the four (4) supplied clips.
3.
For systems that may experience shock or vibration or are installed outdoors or in wash
down environments, the rectangular cut and clips are used and perimeter holes must be
drilled in the panel. The supplied studs are then inserted into the perimeter of the
controller and supplied nuts will secure the perimeter of the unit to the panel.
4.
Please reference the XL+ installation cutout drawing document (MAN1108) for further
details.
5.
Remove all connectors from the XL+ OCS unit.
6.
Make sure both inner and outer gaskets are installed on the XL+ OCS and are free from
dust and debris. Check that the corners of the gasket are secure.
7.
Pass the unit through the panel.
8.
The two (2) spring clips will latch the unit in the panel.
9.
Insert each of the four (4) mounting clips into the slots in the XL+ OCS case. One clip
should be installed on each corner. Lightly tighten each screw so the clip is held in place.
10.
Tighten the screws on the clips such that the gasket is compressed against the panel.
Recommended torque is 7-10 in-lbs (0.79-1.13 Nm).
11.
If the perimeter studs are needed, it is recommended to use a thread locker (similar to
242 Blue Loctite). Use supplied lock washers and nut. Recommended torque is 3-4 in-lbs
(0.34-0.45 Nm). Refer to Figure 3.2 (below) for the proper torque sequence.