
VIG-MIM/ZONE Mimic or Zonal panel
See also Mimic configurer part of this manual.
q
Unhook the front cover.
Zonal panel
NOTE:
The zonal panel is supplied with the pre-programmed EPROM and
the
zone designation
plan fitted.
Mimic panel
q
A custom site plan must be fitted in-between the two translucent sheets
of the panel front cover. Also a custom EPROM must be fitted on the
master repeat card, see Mimic configurer part of this manual.
NOTE:
Ensure the custom site plan is fitted to the panel to coincide with
the LED matrix.
q
Open the hinged inner door.
q
Connect the mains supply and power-up the panel.
•
the green and amber LEDs on the master repeat card are lit
•
the local buzzer sounds for a short duration
•
after a short duration a message will appear on the mimic panel:
OFF LINE
q
Operate the keyswitch on the panel, this will:
•
cancel the local buzzer
•
and carry out lamp test.
q
Connect the battery supply.
In ter face and panel out sta tions
VIG-MIM/ZONE Mimic or Zonal panel
Vigilon Sys tem Com mis sioning
Figure 3-1 Mimic panel
battery connection
cd8m087