OPERATING ENGINE
3-13
2. Run the engine at slow idle speed for more than 5
minutes.
f
NOTE: At this time, do not operate the engine in slow or fast
speed.
3. Slowly extend the bucket cylinder to stroke end.
f
NOTE: Do not continuously operate the bucket control lever
for more than 10 seconds at this time.
4. Slowly retract the bucket cylinder to stroke end.
f
NOTE: Do not continuously operate the bucket control lever
for more than 10 seconds at this time.
5. Repeat steps 2 to 4 above until the loader front
operating speed becomes normal. When the
atmospheric temperature is lower than 0 °C, extend the
warming up operation time by running the engine at
middle speed.
6. Run the engine at low idle speed.
7. Slowly turn the steering wheel until the steering cylinder
is close to the end of stroke.
8. Slowly turn the steering wheel in the opposite direction,
until close to the end of stroke.
9. Repeat steps 7 and 8 five times.
Summary of Contents for ZW 310-6
Page 4: ......
Page 10: ...CONTENTS MEMO ...
Page 14: ...INTENDED USE 2 MEMO ...
Page 57: ...SAFETY SIGNS S 43 ZW310 6 SS 3777 2 ...
Page 59: ...SAFETY SIGNS S 45 ZW330 6 92Z7B S 40EU ...
Page 246: ...BREAK IN 2 2 MEMO ...
Page 280: ...DRIVING MACHINE 4 20 MEMO ...
Page 460: ...MAINTENANCE 7 146 MEMO ...
Page 464: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Page 468: ...STORAGE 10 4 MEMO ...
Page 474: ...TROUBLESHOOTING 11 6 MEMO ...
Page 498: ...INDEX 14 6 MEMO ...
Page 502: ...CONFORMITY MEMO ...
Page 506: ......