SAFETY
S-10
Investigate Job Site Beforehand
When working at the edge of an excavation or on a road
shoulder, the machine could tip over, possibly resulting in
serious injury or death.
Investigate the configuration and ground conditions of
the job site beforehand to prevent the machine from
falling and to prevent the ground, stockpiles, or banks
from collapsing.
Make a work plan. Use machines appropriate to the work
and job site.
Reinforce ground, edges, and road shoulders as
necessary. Keep the machine well back from the edges of
excavations and road shoulders.
When working on an incline or on a road shoulder,
employ a signal person as required.
Confirm that your machine is equipped with a FOPS cab
before working in areas where the possibility of falling
stones or debris exist.
When the ground footing is weak, reinforce the ground
before starting work.
When working on frozen ground, be extremely alert. As
ambient temperatures rise, the ground footing becomes
loose and slippery.
Beware of the possibility of fire when operating the
machine near flammable objects such as dry grass.
SA-447
Summary of Contents for ZW 310-6
Page 4: ......
Page 10: ...CONTENTS MEMO ...
Page 14: ...INTENDED USE 2 MEMO ...
Page 57: ...SAFETY SIGNS S 43 ZW310 6 SS 3777 2 ...
Page 59: ...SAFETY SIGNS S 45 ZW330 6 92Z7B S 40EU ...
Page 246: ...BREAK IN 2 2 MEMO ...
Page 280: ...DRIVING MACHINE 4 20 MEMO ...
Page 460: ...MAINTENANCE 7 146 MEMO ...
Page 464: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Page 468: ...STORAGE 10 4 MEMO ...
Page 474: ...TROUBLESHOOTING 11 6 MEMO ...
Page 498: ...INDEX 14 6 MEMO ...
Page 502: ...CONFORMITY MEMO ...
Page 506: ......